NO
EN
DE
IT
FR
ISL
Banner wechselen
600 Polar W
Kandahar
300 Polar
Everest
GT-450
LH 500
Leitwolf

 

  Mitglieder

 

- Useraccount erstellen
- Passwort vergessen?
Username:

Passwort:

Bei jedem Besuch automatisch einloggen

 
 

  Seite

 

- Startseite
- Über uns

 
 

  News

 

- Besuchte Gebiete
- Letzte 15 Artikel
- Archiv

 
 

  TråkkeMap

 
 

  Bildergalerie

 

- Suche
- Top 100
- Letzte 100 Deutschland (0)
- Letzte 100 Welt (0)
- Screeners Choice
- Kommentare (0)

 
 

  Diskussionen (0)

 
 

  Gebraucht-Markt

LEITNER building new 3S TRICABLE ROPEWAY!

Lagt til av: Espen Børresen | publisert: 02.08.2011

Having successfully constructed the first tricable system in Italy, the Rittner Bahn in Bolzano, LEITNER has now been awarded a contract to build another 3S ropeway, “LES PRODAINS” in Avoriaz, France. The ropeway will serve as the main link connecting Morzine and Avoriaz and will be used by skiers as well as tourists traveling to and from Avoriaz. It will therefore function as both a winter sports lift and an innovative means of urban transportation.

In order to meet these special requirements, the tricable gondola lift will be in operation from 7:00 a.m. to 11:00 p.m. daily during the winter, with flexible operation possible during off-peak times, depending on demand. When the first stage of construction is complete, the system will consist of 12 cabins, each able to carry 35 people, traveling at a speed of 7 meters per second and transporting up to 2000 passengers per hour. Tourists will also be able to use the LEITNER 3S ropeway to reach Avoriaz during the summer. The second stage of construction, which will increase capacity to 2400 passengers per hour, is already in the planning phase.

The new 3S system, which replaces the aging aerial ropeway currently in use that has a capacity of 450 people per hour, should begin operations by around Christmas, 2012.

According to Martin Leitner, member of the board of directors of LEITNER: “The primary reasons why the Société d’éxploitation d’Avoriaz, a subsidiary of the SOFIVAL Group, awarded the contract to LEITNER were the fact that we were able to meet the exact needs of the client and they were impressed by the outstanding dedication of our employees.”

LEITNER ropeways is proud to be working on this significant project, which is also the start of serial production of the 3S system.

FACTS
Contractor: LEITNER France
Purchaser: Société d’éxploitation d’Avoriaz
Ropeway System: 3S
Inclined Length: 1538 m
Vertical Rise: 575 m
Transport Capacity: 2000 p/h (with a planned increase to 2400 p/h)
Number of Cabins: 12 (14), each able to carry 35 people
Number of Towers: 2
Operating Speed: 7 m/s

For more information, please visit www.leitner-lifts.com.

Source: www.ropeways.net

Galerie hat 23086 bilder!
0 heute hinzugefügt - 0 letzte Woche hinzugefügt

Willkommen auf snow-goomer.net! Auf dieser Website findest du die größte Bildergalerie, neuesten Diskussionen und viele viele Daten. Die deutsche Version ist neu und wird laufend erweitert!

 

Letzten 5 Diskussionen

Opplæringsdokument (2 antworten)

Opplæringsdokument (0 antworten)

Type Hydraulik olje (2 antworten)

deler til kassbohrer (1 antworten)

Sikksakk kjøring (19 antworten)

Alle Diskussionen

 

Letzten 20 Screeners Choice

 

Neuestes Bild

 

Hole Olsen Aktiv - Copyright 2006-2016 (All rights reserved)

All information on this page (including pictures) belongs to the author, and commersial
use of the information is not under any circumstances allowed without the owners acceptance.
For private purposes information can be used, but we strongly demand you in any case to refer to trakkemaskin.no.

informasjons lag